PROD-I-756 Capturing changes/updates within a RFx file when imported at different times
in Projects
Team, on similar lines to Duplicate Projects, there are scenarios wherein for a Project, the same RFx file can get updated through the initial stages of a RFx lifecycle. For e.g. the excel or doc had 100 requirements initially during import. After some time and a few rounds of clarifications the doc gets updated and sent back with 120 requirements. Now for the additional 20 requirements, there isn't a standard or easy way to merge those updates. While there are ways to go about doing the same, they aren't intuitive. We need to introduce a way to capture a